ITALIANO
ENGLISH
DEUTSCH
FRANÇAIS
ESPAÑOL
004778610 - 16/12/2020
49
5.2 Checking the floor where the appliance will be placed
6 PREPARATION OF THE INSTALLATION SITE
7.3 Levelling of the appliance
7.8 Hot air delivery connection
8.2 Description and positioning of the deflectors
8.3 Assembly of the deflectors and O-RING
8.4 Assembly of refractory brick
9.3 Operation version WT60 3D N16