ILP 25/33 Installation Manual
Rev. 1.4
- 50 -
13.6
Toggle Switch Installation
The Toggle Switch is weatherproof from factory, do no substitute or tamper with the switch.
Determine location for fixed toggle switch on corner post in a way that the operator can view the
platform and surrounding areas while operating the liftgate. Place toggle switch in a horizontal
position
Steps:
Roll Up Door Vehicles
1. Mounting Hole Pattern: Locate area on rear curb side post of body where switch can be reached by
the operator from the ground.
Position the holes approximately 24” up from vehicles floor. Drill two
5/32“ (.156“) holes spaced at 1-3/4“ vertically, and one 7/8” hole, centered to the two 5/32“ holes, for
the switch cable harness,
Fig.42.
2. Wiring: Route cable harness through rear post and down to the hydraulic power unit. Heat shrink or
protect all connections. Use cable clamps to keep the cable clear of all moving parts. Reference the
wiring diagrams in Sections
13.9-13.10
3. Operation: Verify all operations are functional as intended. Secure the switch to the corner post with
the two #10-
24 x 1” self-tapping screws.
IMPORTANT: Screws must be hand tighten, do not use power tools to tighten screws.
ø7/8"
Mounting Hole Pattern
1-3/4"
Bed Extension
Corner Post
(Curb Side)
Sill
2X
ø5/32"
24" Approx.
7/8"
Fig.42