ILP 25/33 Installation Manual
Rev. 1.4
- 52 -
13.7
Liftgate Shut-Off Switch
Liftgate Cab ON/OFF Switch MUST be installed and in clear view of driver.
Steps:
1. Mounting Switch:
Truck Application: Install the liftgates shut off switch on the vehicles dashboard in clear view of the
driver and within reach from the ground,
Fig.43
.
Trailer Application: Install the shutoff switch on the dock bumper strut, if applicable, or use the
faceplate to install the switch on the vehicles b
ody as shown (faceplate requires a 2” hole to be
drilled on vehicle body for installation),
Fig.44
.
Decal: Apply the accompanying decal in the surrounding area of the switch.
Strut
Shutoff Switch
Location for Trucks
Shutoff Switch
Trailer Shutoff Switch
on Dock Bumper Strut
Decal
Decal
Rocker Switch
Trailer Shutoff Switch
on Vehicle Body
Vehicle
Body
Shutoff
Switch
2" Drilled Hole
on Body
Switch
Faceplate
Decal
2. Route Wire: Route and secure the control wire cable every 12 inches against the frame with frame
clamps or equivalent along the frame to pump & motor box.
3. Check Wire Clearance: Verify wire is clear of all moving parts and securely tied up.
4. Cover Connections: Heat shrink or protect all connections.
5. Wiring: Reference Section
13.9-13.10 for wiring according to the liftgates
specification’s.
Rocker switch shall not be installed anywhere outside the truck cab.
Inspect and test all electrical connections, wiring and the different functions to
make sure that the electrical installation is complete.
Fig.43
Fig.44