ILP 25/33 Installation Manual
Rev. 1.4
- 63 -
16
Lubrication
1. Lower the platform to the ground.
2. Remove red protector caps from each component. Lubricate, grease, and oil per diagram below.
3. Cycle platform up and down several times. Lubricate and grease all points again.
4. Wipe any excess grease and replace all red protector caps on zerks.
-Platform Hinges
-Cart Stops (If, installed)
4 zerks:
- 1 Cylinder
- 2 Lift arm
- 1 Parallel arm
4 zerks:
- 1 Cylinder
- 2 Liftarm
- 1 Parallel arm
4 zerks:
- 1 Cylinder
- 1 Parallel arm
- 2 Shackle
4 zerks:
- 1 Cylinder
- 1 Parallel arm
- 2 Shackle
Open enclosure to
check and refill oil.
Grease
: Location of Grease Zerks (7 on each side, 14 total).
Oil
: Oil level in the power pack tank (see marking inside of power pack reservoir).
Lubricate
: Platform hinges, Slide Rails and optional Cart Stops.