7 Electrical Installation
Revision 1.5
- 26 -
7.4
Trail charger installation
G
ro
u
n
d
C
a
b
le
Ground
+
-
Liftgate Mount Frame
2
G
a
.
L
ift
g
a
te
P
o
w
e
r
C
a
b
le
Ground
+
-
Aux. Batteries
+
-
Ground
+
-
+
Figure 23 Trail charger wiring
•
Install the 2 Ga. positive and negative battery cables securely from mount frame to battery and
truck/trailer chassis with proper service loop for sliding liftgate. Make sure the cables can not catch on
anything during the slide, test several times.
•
Running the cables along the frame, secure the cables every 12 inches.
Trail Charger
7 way plug
– aux pin
for tractor ignition
switch
7 way plug
– white
for tractor power