Installation manual
Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can comprise
several parts! In this case, these parts will have to be screwed together prior to other actions). Having installed
the last wall logs, place the apex on the front and back walls and attach them with screws.
The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring that the
roof is placed firmly and in the right place.
Now place the purlins in the
corresponding indents in the
apexes.
Make sure that the upper wall log,
apexes and purlins are level.
Having fitted the purlins, screw
them onto the apex from above.
Installation of purlins:
ATTENTION
: If the wall logs are not properly pressed on top of one another without gaps, the upper wall log
may not be on the same level with the apexes. In this case you should tap the wall logs downwards as
necessary or plane the apex or sidewall log somewhat lower.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION
: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Begin the installation of the roof boards
from the front edge of the roof
. Tap the boards lightly and
attach them from above and below with nails to the purlins and upper wall log.
ATTENTION
: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.
During the whole process of installing the roof boards, make sure that their crest purlins coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.
The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the purlin ends.
Summary of Contents for FR28-6132-1
Page 69: ...BOX...
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ...BOX...
Page 78: ......
Page 79: ...165 165 Pst1 Pst2 BM1 Pst1 Pst2 5x90 5x90 5x90 x4 3 1 3 1 1...
Page 83: ...4 5x50 x22 4 5x50 a 5x 4 5x50 a 10x 4 5x50 a 6x 5...
Page 84: ......