Installation manual
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Door and window
Doorframe:
➢
If it is a double door, the
doorframe
is
supplied
in
separate
parts
due
to
transportation requirements and
you will have to begin by
assembling it.
➢
To do this, place together the 4
parts of the frame and screw
them onto one another.
➢
Make sure that the part of the
frame with the deeper notch is
installed upwards. The lateral
jamb parts have hinges and are
mirrored.
➢
It is recommended to install the
leaves later.
➢
If it is a single door, its frame and
leaf
are
supplied
already
assembled.
Doorframe installation (Only necessary for a double door!):
Door installation:
The doorframe is placed at the
formed aperture and pushed with
force onto the lower log. If it is a
double door, place the leaves on the
hinges now. To open and close the
door, fit the separately packaged lock
and handle.
Window installation:
Continue with the installation of the wall logs until you reach the window height. The wall plans (see
Technical specifications) show how many logs go under the window. Install the window similarly with
the door. Just like the door, push the window frame with the window into the window aperture onto the
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).
ADVICE
: Definitely make sure that the windows and doors open in the proper direction. The doors
always open from the inside
to the outside
. The tilt&turn windows open
to the inside
. The revolving
and the slinging windows open
to the outside
(the window handles are on the inside).
Summary of Contents for FR44-4141-1
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 106: ...C ca 25 ca 1 RB2 1 RE2 x RB2 x SP2 4 5x50 RE2 2 RE2 3 RE2 1...
Page 107: ...Rai6 Rai8 Rai10 Rai5 Rai7 Rai9 Rai1 Rai2 Rai3 CoB1 CoB5 CoB4 CoB5 CoB4 CoB1...
Page 108: ...RE2 x RB2 x SP2 Rai4 Rai6 Rai1 Rai2 Rai1 Rai2 4 5x50 E...
Page 109: ...19x114 19x114 RE2 x RB2 x SP1 underlayer is recommended SBS SBS SBS SBS...
Page 110: ...SBS CoB CoB 4 5x50 SBS SBS...
Page 111: ...4x16 4 5x20...
Page 112: ...CoB2 CoB3 Sla2 4 5x20 4 5x50 6x100 4x16 4 5x30...