background image

Installation manual 

 

 
 

 

 

Having installed the roof boards, the roof felt and roof 
slats must be attached.  

The table of components shows whether the roof 
cover material and slats are included with this 
house option! 

First of all, screw the roof edge reinforcements and eave 
edgings under the roof board ends. Then install the roof 
cover material. 

 

 

 

Installation of roof slats: 

 

Roof cover material

Cut the roof felt in accordance with the roof length into suitable pieces and begin installing them 
parallel to the lower edge of the roof, moving toward the crest and placing the felt strips in the direction 
from the back wall to the front wall. The felt should extend from the edge by approximately 2-4 cm. 
Attach the roof felt to the roof boards with the supplied felt nails at intervals of about 15 cm. Make sure 
that the felt strips overlap by at least 10 cm.  

 (NB! Some house options do not include it in the kit!) 

 

 

Floor 

Only when the house is built completely  you  can  install the floor boards, thus avoiding unnecessary 
smudging on the floor. 

Place the floor boards on the base frame, tap them lightly against one another and then nail them with 
force to the foundation joists. If necessary, cut the last floor board to the suitable width.  

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

ATTENTION

: Depending on the climate at the house location, the floor boards can either swell or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some 
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you 
can install the boards densely because they will become drier and spaces may appear between them.  

 

Summary of Contents for FRB28-3232-2

Page 1: ...vendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis ce bulletin de contr le avec le r c pi...

Page 2: ...Aankoopbewijs Datum Kaufbeleg Datum Date du r c piss Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Pa...

Page 3: ...kniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvis...

Page 4: ...trollnummer des Hauses Es ist m glich die Reklamation nur dann als Garantiefall zu behandeln wenn Sie die Kontrollnummer Ihrem Fachh ndler weitergeben Abweichungen die keinen Reklamationsgrund darstel...

Page 5: ...r wichtig sowohl die Innen als auch die Aussenseiten der T ren und Fenster auf einmal zu streichen Andernfalls k nnen sie sich verziehen Nach dem Aufbau empfehlen wir Ihnen die Aussenhaut ohne Dach zu...

Page 6: ...Fundamentvorschl ge Streifen oder Punktfundament Beton bzw Gehwegplattenfundament gesch ttetes Betonfundament Bereiten Sie das Fundament so vor dass die Lagerh lzer berall im Abstand von max 50 60 cm...

Page 7: ...Hammer direkt auf die Feder schlagen Die Wandpl ne Siehe Technische Daten zeigen Ihnen den Aufbau der W nde Als erstes verlegen Sie die halben Bohlen der Vorder und R ckwand und befestigen Sie sie mit...

Page 8: ...ren Sie fort die W nde hochzuziehen bis Sie zur Fensterh he gelangen Aus den Wandpl nen siehe Technische Daten wird ersichtlich wie viele Bohlen unter den Fenstern sind Beim Einsetzen der Fenster verf...

Page 9: ...en der Dachbretter ist darauf zu achten dass das Haus hundertprozentig in Waage steht berpr fen Sie mittels einer Wasserwaage alle 4 Seitenw nde WICHTIG Der Dachbelag darf nur ber eine standfeste Leit...

Page 10: ...Haus komplett aufgebaut wurde erfolgt das verlegen der Fussbodenbretter dadurch vermeiden Sie eine unn tige Verschmutzung des Fussbodens Legen Sie die Fussbodenbretter auf die Lagerh lzer klopfen Sie...

Page 11: ...amit die Wandbohlen sich nach unten setzen k nnten Montage der Sturmleisten Allgemeine Tipps Problem Es entstehen Spalten zwischen den Bohlen Ursache Es sind zus tzliche Details an den W nden angebrac...

Page 12: ...f the house We can only review complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already pai...

Page 13: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 14: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 15: ...r that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appe...

Page 16: ...you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with...

Page 17: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 18: ...cm NB Some house options do not include it in the kit Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Place the floor bo...

Page 19: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Page 20: ...e peut tre trait e dans le cadre de la garantie que si vous communiquez le num ro de contr le votre revendeur sp cialis Ecarts qui ne constituent pas un motif de r clamation Le bois est un produit nat...

Page 21: ...l est tr s important de peindre en une seule fois aussi bien les faces int rieures que les faces ext rieures des portes et des fen tres Dans le cas contraire elles pourront se d former Une fois le mon...

Page 22: ...ment ventil e par dessous Nous vous proposons les fondations suivantes Semelle filante ou fondations ponctuelles Fondations en b ton ou fondations en dalles de ciment Fondations coul es en b ton Pr pa...

Page 23: ...pas partie de l tendue de la fourniture Montage des longrines Parois Lors du montage des parois il est important de savoir ceci Les madriers des parois s embo tent toujours ressort tourn vers le haut...

Page 24: ...ssaire seulement dans le cas d une porte double Montage de la porte On introduit le dormant par dessus dans l ouverture cr e et on le repousse en but e contre le madrier se trouvant tout en bas Dans l...

Page 25: ...ANT Si les c t s sup rieurs des pannes n affleurent pas sur le pignon vous devez donner de petits coups sur les madriers des parois pour les abaisser ou bien raboter un peu plus le pignon et le madrie...

Page 26: ...s pour carton bitum en respectant un espacement de 15 cm environ Lors de la mise en place des couches suivantes veillez ce que celles ci recouvrent la couche pr c dente sur 10 cm au moins Apr s la pos...

Page 27: ...as de besoin raccourcissez les baguettes du c t sup rieur Les vis t te bomb e et collet carr ne doivent tre serr es qu la main afin que le bois puisse continuer travailler Une fois que la maison s est...

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Reviews: