Installation manual - English
2 Installation manual
Begin by choosing a suitable location for the house. Make sure that there is enough space around the house
both for playing and for regular inspection and maintenance of the house (recommended: at least 1 metre on all
sides).
Since the foundation joists are in constant contact with the ground they must be treated with a special wood
preservative.
Level the ground and install the foundation joists according to the drawing below:
3 Maintenance manual
It is recommended to inspect the house thoroughly every 6 months. Regular painting of the house will prolong
its useful life substantially.
You should also check the condition of the roof to discover any leaks as early as possible. Eliminate leaks as
you find them to prevent rainwater from damaging the roof and other wooden parts of the house.
Make sure that all screws and bolts are firmly fastened. In lengthy periods of dry weather wood can shrink and
the screw/bolt spots attachments can become weak. Conduct regular checks and tighten the screws/bolts as
necessary!
Be especially attentive when checking barrier and door attachments.