background image

Installation manual 

 

 
 

 

 

Having installed the roof boards, the roof felt and roof 
slats must be attached.  

The table of components shows whether the roof 
cover material and slats are included with this 
house option! 

First of all, screw the roof edge reinforcements and eave 
edgings under the roof board ends. Then install the roof 
cover material. 

 

 

 

Installation of roof slats: 

Roof cover material (NB! Some house options do not include it in the kit!) 

Cut the roof felt in accordance with the roof length into suitable pieces and begin installing them 
parallel to the lower edge of the roof, moving toward the crest and placing the felt strips in the direction 
from the back wall to the front wall. The felt should extend from the edge by approximately 2-4 cm. 
Attach the roof felt to the roof boards with the supplied felt nails at intervals of about 15 cm. Make sure 
that the felt strips overlap by at least 10 cm.  

 

 

 

Having installed the roof cover material, attach the 
wind braces to the roof and the facia boards to the 
rafters and upper wall logs.  

 

Installation of wind braces and facia boards: 

 

Floor 

Only when the house is built completely you can install the floor boards, thus avoiding unnecessary 
smudging on the floor. 

Place the floor boards on the base frame, tap them lightly against one another and then nail them with 
force to the foundation joists. If necessary, cut the last floor board to the suitable width.  

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

ATTENTION

: Depending on the climate at the house location, the floor boards can either swell or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 

Summary of Contents for FRK34-4735

Page 1: ...i difettosi già montati o verniciati sono esclusi dal diritto alla sostituzione Ogni altro diritto resta escluso In caso di reclamazione procedere nel modo seguente presentare questo certificato di controllo unitamente alla prova d acquisto al rivenditore Solo in questo modo la Sua reclamazione potrà essere evasa rapidamente e senza problemi Español La casa que ha adquirido ha sido fabricada de ac...

Page 2: ...bers adresse Ostajan osoite Köparens adress Telephone Telefoon Telefon Téléphone Teléfono Telefon Telefon nr Puhelin Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Spedizioniere Mezzo proprio Entrega Transporte organizado transporte propio Transportør Sendes Hentes Transportør Sendes Hentes Rahdinkuljettaja Nouto Muut S...

Page 3: ... tuotteeseen teknisiä muutoksia Tillverkaren har rätt att utföra tekniska förändringar för produkten Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Montážní návod Asennusohje Installationsmanual Log cabin FRK34 4735 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Anneks Tuinhuis Zahradní domek T...

Page 4: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do no...

Page 5: ... windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s sa...

Page 6: ... At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side with intervals not exceeding 50 60 cm Consult an expert in this field or have th...

Page 7: ...orresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications Fir...

Page 8: ...leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the window ape...

Page 9: ...or plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the front ed...

Page 10: ... with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smu...

Page 11: ...ary shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door...

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Reviews: