background image

Installation manual 

 

 
 

 

 

Sort the components  based on 
the wall plans (see Technical 
specifications) and place them 
at the four sides of the house in 
the installation sequence. 

Preparation of components: 

ATTENTION:

  Never place the 

components directly on grass or 
a muddy surface because it will 
be very difficult or even 
impossible to clean them up 
later! 

 

 

Foundation 

A good foundation is the most important aspect guaranteeing the duration and safety of your house. 
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the 
house, its stability and especially the matching of the doors. With a good foundation, your house will 
stand for many years more.  

Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At 
the same time make sure that there are sufficient air apertures under the house floor for ventilation.  

We recommend the following foundation options: 

 

Strip or spot foundation 

 

Foundation from concrete or pavement slabs 

 

Cast concrete bed 

Prepare the foundation so that the foundation joists  are propped up on every side with intervals not 
exceeding 50-60 cm. 

Consult an expert in this field or have the foundation prepared by specialists. 

 

3  Garden house assembly 

ATTENTION

:  

  You will find included in the house package one spare log (longest wall log). 

  You will find included in the house package one spare board (longest roof or floor board). 

  The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm 

long). 

  The drawings have the details  marked with three-digit position numbers. The exact positions of 

those details that have the third digit “x” can be found in the specification list. 

All of the details listed above ARE NOT mentioned in the specification list. 

www.simplylogcabins.co.uk

Summary of Contents for Whitewood Malta 2

Page 1: ...nt exclues de tout change Toutes les revendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis...

Page 2: ...___________________________________________ P dansk Kontrol Certifikat Opbevares sikkert Dansk Det k bte hus er fremstillet i overensstemmelse med de h je kvalitets krav Produktet er blevet omhyggelig...

Page 3: ...nes t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin FRB28 3227 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin ZL...

Page 4: ...y review complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already painted processed with a...

Page 5: ...pregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather...

Page 6: ...sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cas...

Page 7: ...ways assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Te...

Page 8: ...eight The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the wi...

Page 9: ...dewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder...

Page 10: ...ons do not include it in the kit Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Place the floor boards on the base frame...

Page 11: ...ts so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell...

Page 12: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 13: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 14: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 15: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 18: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 19: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 20: ...w w w s i m p l y l o g c a b i n s c o u k...

Reviews: