Overall Dimensions including base (Approx)

We strongly recommend the use of work gloves during assembly . Do not attempt
to assemble the greenhouse in windy or wet conditions.

Do not touch overhead power cables with the aluminum profiles. Always wear shoes

and safety goggles when working with extruded aluminum. Dispose of all plastic

bags safely - keep them out of reach of small children. The greenhouse must be

positioned and fixed on a flat level surface. Do not lean against or push the greenhouse
during construction. Keep children away from the assembly area. Do not position

your greenhouse in an area exposed to excessive wind.

Do not attempt to assemble this greenhouse if you are tired, have taken drugs or

alcohol or if you are prone to dizzy spells. If using a step ladder or power tools ensure

that you follow the manufacturers safety advice. Hot items such as recently used grills,
blowtorches etc. must not be stored in the greenhouse. Ensure there are no hidden

pipes or cables in the ground before inserting the pegs.

This is a multi-part assembly. Allow at least 180 minutes for assembly process.

Selecting a site - choose a sunny level position away from overhanging trees. If you

are fixing your greenhouse directly to a solid concrete foundation use the pre drilled
holes in the metal base supplied. The component parts should be checked and laid

out close at hand. Keep all small parts (screws etc.) in a bowl so they do not get lost.

Keep roof clear of snow and leaves.

When your greenhouse needs to be cleaned, use a mild detergent solution and rinse

with cold clean water. DO NOT use acetone, abrasive cleaners or other special

detergents to clean the clear panels.
Replacement parts - contact Customers service helpline at:

For additional information please visit our web site: www.palram.com

Tape measure

Work gloves

Crosshead screwdriver
Bradaw

Drill
2mm metal drill bit

Scissors

Step ladder
Spirit level

If help is required seek professional advice whithin store.

LEAN-TO

Greenhouse

ASSEMBL Y IN STRUC TIO NS

129L x 71W x 165H CM

Keep these instructions in a safe place for future reference.

You must read these instructions carefully before you start to assemble
this greenhouse. Please carry out the steps in the order set out in these
instructions.

Do not tighten the screws of the Greenhouse until completing on the
assembly of the panels.

I MP O R TA N T

SAFETY ADVICE

GENERAL ADVICE

CARE & MAINTENACE

TOOLS & EQUIPMENT

Version  #3

Summary of Contents for 700492

Page 1: ...a site choose a sunny level position away from overhanging trees If you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base supplied The com...

Page 2: ...771 1180mm 46 46 2 A751 585mm 23 03 1 A754 610mm24 02 2 M745 RIGTH M746 LEFT M747 1 2 4 2 2 2 M8x16mm 0 63 2 1 1 1 1 3 1 P501 P502 P520 P519 1 P521 P522 1 1 1 3 4 2 30 30 8 4 2 M6x10mm 0 39 M6x10mm 0...

Page 3: ...745 746 A B 447 747 C 412 412 A761 1 Assembly of base profiles Be sure to bend the profiles into 90 and to tighten firmly with screws 447 QTY 1 A761 QTY QTY 1 M747 1 M745 1 M746...

Page 4: ...mbly of profile A761 NOTE All nuts 412 should be on the inside of the stretcher insert the screws 411 from the outside inwards DO NOT FASTERN THE SCREWS AND NUTS until you complete your greenhouse ass...

Page 5: ...to use the lower hall of existing two Assembly of the gutter A731 The profile also includes the door track Be sure to locate the gutter as shown in the illustration A253 A754 411 412 A754 5 4 QTY 2 A...

Page 6: ...he illustration Assembly of the A741 profiles Connect the profile on both ends to profiles A715 and A716 and mark the connecting points to the wall using the pre drilled halls in the profile A716 A715...

Page 7: ...of Connect the proile to profiles A741 on one side and A731 on the second side Assembly of profile A701 on the front wall Connect the profile to the profile A731 on one sideand to profile A761 on the...

Page 8: ...tender appropriate lubrication material Connect profiles A771 with profiles A791 using screws 421 411 Door sub assembly continued Lay panel P502 Be sure to insert both ends into the channel in profile...

Page 9: ...ips Onto the aluminum profiles in it s assigned position See illustrations A to D Door sub assembly Continued Connect all four plastic rollers P304 using screws 421 and nuts 422 A B C C D A B C D P332...

Page 10: ...panels Slid the door unto the track on frofile A731 gutter and on the same time on proffile A761 Insert two screws 411 nuts 412 on both ends of profile A731 Assembly noise reduction profile P317 to wa...

Page 11: ...stic strips P331and P330 See illustations A to D Lay panel P501 Be sure to insert upper and into the channel in profile A731 and frofiles A754 P501 P501 P501 P331 P330 17 16 QTY QTY 3 P501 2 P330 4 P3...

Page 12: ...iangle panels P521 P522 Connect plastic strips P334 See illustrations A to D at step 17 P333 P521 P522 P520 P334 P334 19 18 Assembly follows illustration QTY QTY P316 P316 P316 P520 1 P316 1 P520 2 P3...

Page 13: ...11 411 411 A752 A307 P519 P302 412 422 Vent sub assembly Apply profiles A782 A751 A752 and assemble according to the illustration using screws and nuts 411 412 Assembly follows illustration 21 20 QTY...

Page 14: ...Fasten all screws and nuts of your Lean To greenhouse M307 23 22 QTY 2 M307...