I M P O RT A N T
Please read these
instructions carefully
before you start to
assemble this greenhouse.
Please carry out the steps
in the order set out in
these instructions.
Do not tighten the screws
of the Greenhouse until
completion of the
assembly of the panels.
Keep these instructions in
a safe place for future
reference.
Make sure the base in steps 1&2 is square
by measuring the diagonals and level by
using a spirit level.
We strongly recommend the use
of work gloves during assembly .
Do not attempt to assemble the
greenhouse in windy or wet
conditions.
Do not touch overhead power
cables with the aluminum profiles.
Always wear shoes and safety
goggles when working with
extruded aluminum. Dispose of all
plastic bags safely - keep them out
of reach of small children. The
greenhouse must be positioned
and fixed on a flat level surface. Do
not lean against or push the
greenhouse during construction.
Keep children away from the
assembly area. Do not position your
greenhouse in an area exposed to
excessive wind.
Do not attempt to assemble this
greenhouse if you are tired, have
taken drugs or alcohol or if you are
prone to dizzy spells. If using a step
ladder or power tools ensure that
you follow the manufacturers safety
advice. Hot items such as recently
used grills, blowtorches etc. must
not be stored in the greenhouse.
Ensure there are no hidden pipes
or cables in the ground before
inserting the pegs.
Safety Advice
When your greenhouse needs to be
cleaned, use a mild detergent solution
and rinse with cold clean water. DO NOT
use acetone, abrasive cleaners or other
special detergents to clean the clear
panels.
Replacement parts - call our service line.
For additional information please visit
our web site: www.palram.com
Sort the parts and check against the
contents parts list.
Carry out the assembly steps in the
order set out in the instructions.
Screws 411 are to be assembled from
the outside and nuts 412 from the
inside of the greenhouse.
Tighten screws and nuts (411 & 412),
2- 3 turns only, do not fasten them
until completion of the assembly, if
not specified otherwise.
4
Prefix of the parts reference in the
assembly instructions:
A-Aluminum profiles and parts
P5XX–Polycarbonate panels
P3XX–Plastic parts.
M–Metal parts
4XX–Screws, nuts, disks, etc.
The end of all profiles, indicated by
an arrow, is always upward.
The oval hole in the crossbars A256
should always be assembled to the
base of the greenhouse.
The front of the greenhouse is the
wall including the door, and the back
is the opposite wall.
Firmly connect the greenhouse to a
leveled final position immediately
after completion of the assembly.
This is a multi-part assembly best
achived by two people. Allow at least
half a day for assembly process.
Selecting a site - choose a sunny level
position away from overhanging trees.
If you are fixing your greenhouse directly
to a solid concrete foundation use the
pre drilled holes in the metal base
supplied. The component parts should
be checked and laid out close at hand.
Keep all small parts (screws etc.) in a
bowl so they do not get lost.
Do not tighten the screws of the
greenhouse until completion of the
assembly of the panels, unless it says
otherwise.
Tape measure
Work gloves
Plastic or rubber mallet
Lubricant
Phillipshead screwdriver
Step ladder
Drill bit
Large hammer
Scissors
Spanner
Tools & Equipment
Care & Maintenance
General Advice