Step 4:

 Profile 848 should be placed on the left 

hand side to be connected to profile 849. Profile 

848 is the one with the connector at the end.

Step 5:

 After connecting profiles 816 to each 

other clean the connection area using a cloth. 

Place the cover strip on the connection only when 

it is clean and dry. Press the cover strip from one 

side of the connection to the other as mentioned 

in picture 4.

Step 8:

 Profile 835 & 836 should be aligned and 

connected according to the illustration on page 

8 a & b. plug  23 should be inserted to each 

connection while the two dots on the front of 

the plug should be in horizontal position for easy 

assembly.

Step 10:

 Use part 95 as a template in order 

to measure the gap between posts of the 

greenhouse wall and roof area.

Step 11:

 Profile 841 should be placed on the right 

hand side. Profile 840 should be placed on the left 

hand side when viewed from the front.

Step 12:

 Slide the panel 566 till the end of the 

rail and insert it into it’s final position as shown in 

illustration c .

IMPORTANT

Please read these instructions carefully before you start to assemble 
this greenhouse.

Please carry out the steps in the order set out in these instructions.

Keep these instructions in a safe place for future reference.

Step 19:

 Be careful to assemble the window in 

the position as shown on picture 20 a. profile 809 

should be placed while the vent is closed to cover 

any gap. Ensure profile 809 is fitted correctly as 

shown on picture 20 b. The lip on 809 should face 

toward the gutter.

Step 22:

 Slide the panel 566 till the end of the 

rail and insert it into it’s final position as shown 

in illustartion a and b.

Step 23:

 Step inside the greenhouse and turn 

all 23 plugs a 1/4 of a turn clockwise.

Step 24:

 Profiles 814 should be inserted from 

the four corners of the greenhouse, then insert 

profile 815 in between them.

Step 25:

 Ensure you use long screw 450 

to secure the door catch 363 as shown in 

illustration b.

EN

19.01_83172_L

_MV

-9.2

 Important Recommendations

•   Firmly connect the greenhouse to a level 

surface immediately after completion of 

the assembly.

•   Anchoring this product to the ground is 

essential to its stability and rigidity.  

It is required to complete this stage in 

order for your warranty to be valid.

•   Tighten all screws once assembly is 

completed.

»    General Advice

This multi-part assembly is best achieved by two people. Allow at least half a day for the assembly 

process.
Site selection instruction-choose a sunny level position away from overhanging trees. If you are fixing 

your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base 

supplied. The component parts should be checked and laid out close at hand. Keep all small parts 

(screws etc.) in a bowl so they do not get lost.
•  Sort the parts and check against the contents parts list.

•  Carry out the assembly steps in the  order set out in the instructions.

•  The front of the greenhouse is the wall including the door, and the back is the opposite wall.

•  After assembly fit the greenhouse to the base using connectors no. 924 and fit  

the whole unit to a leveled final

•  You may use Silicon lubricant spray in order to help you slide the profiles on the  

connectors. Do not spray the Polycarbonate panels. Use the rubber malet if necessary.

»

 

Safety Advice

We strongly recommend the use of work gloves during assembly.  

Do not attempt to assemble the greenhouse in windy or wet conditions.
Do not touch overhead power cables with the aluminum profiles. Always wear 

shoes and safety goggles when working with extruded aluminum. Dispose of 

all plastic bags safely - keep them out of reach of small children. The greenhouse 

must be positioned and fixed on a flat level surface. Do not lean against or push 

the greenhouse during construction. Keep children away from the assembly 

area. Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs 

or alcohol or if you are prone to dizzy spells. If using a step ladder or power 

tools ensure that you follow the manufacturers safety advice. Hot items such as 

recently used grills, blowtorches, should kept away from the greenhouse walls.
We recommend the greenhouse is bolted to a concrete base or slabs (fix hinges 

are not supplied). However, if you want to fix directly in to the concrete ensure 

there are no hidden pipes or cables in the ground before inserting the pegs.

»

 

Care & Maintenance

When your greenhouse needs to be cleaned, use a mild detergent solution and 

rinse with cold clean water. DO NOT use acetone, abrasive cleaners or other 

special detergents to clean the clear panels.

»

 

Tools & Equipment

•  Tape measure  

•  Work gloves  

•  Plastic or rubber mallet  

•  Phillipshead screwdriver

•  Step ladder  

•  Scissors  

•  Spirit level - For base alignment  

• Cloth

Summary of Contents for Snap & Grow 8' Series

Page 1: ...83172 _18 06 _MV 9 2 SnowLoad 15lbs ft2 115kg m2 Snap Grow 8 x8 4 Extension Wind Resistance 90km hr 55ml hr EXTENDABLE PRODUCT Light Transmission 90...

Page 2: ...ngland France Germany International customer service palram com customer serviceUK palram com customer serviceFR palram com customer serviceDE palram com customer service palram com www palramapplicat...

Page 3: ...SNG 8 Series Extending the Greenhouse 8 x8 8 x12 8 x16 8 x20 Index 8 x8 8 x8 8 x12 4 Ext 8 x8 8 x16 4 Ext x 2 8 x8 8 x20 4 Ext x 3 8 x 4 Ext 8 x 8 8 x 8 8 x 8 8 x 8 8 x 8 8 x 4 8 x 4 8 x 4...

Page 4: ...SNG 8 Series Extending the Greenhouse 8 x24 8 x28 8 x32 Index 8 x8 8 x28 4 Ext x 5 8 x 4 Ext 8 x 8 8 x8 8 x24 4 Ext x 4 8 x8 8 x32 4 Ext x 6 8 x 8 8 x 8 8 x 8 8 x 4 8 x 4 8 x 4...

Page 5: ...ompleted General Advice This multi part assembly is best achieved by two people Allow at least half a day for the assembly process Site selection instruction choose a sunny level position away from ov...

Page 6: ...e plac sur la partie droite Le profil 840 doit tre plac sur la partie gauche quand on les regarde depuis le devant de la serre Etape 12 Faire glisser le panneau 566 depuis la fin du rail et l ins rez...

Page 7: ...e con el contenido de la lista de piezas Lleve a cabo los pasos de montaje en el orden indicado en las instrucciones La parte frontal del invernadero es la pared incluyendo la puerta y la parte poster...

Page 8: ...efinden Pflege und Wartung Benutzen Sie eine milde Reinigungsl sung f r die Reinigung Ihres Gew chshauses und sp len Sie es danach mit kaltem sauberem Wasser ab Benutzen Sie AUF KEINEN FALL Azeton Sch...

Page 9: ...ustrato nelle figure a e b Passo 23 Entrare all interno della serra e ruotare tutti i 23 inserti di 1 4 di giro in senso orario Passo 24 I profili 814 devono essere inseriti dai quattro angoli della s...

Page 10: ...4 Extenshion package Sr 813 814 815 830 0 816 cm Inc Qty Item 25 L 26 7021 25 11111 em 1111 26 7 7023 IL 824 ri 817 cm Inc Qty Item 809 Fri 835 836 Fri ke 837 838 839 r r cm Inc 840 IYAL 841 Qty Item...

Page 11: ...Inc I 833 852 854 855 Qty Item V NI 856 858 cm Inc Qty Item 256 O 8550 459 924 O 560 O MEE7 566 Qty Item 558 563 561 562 559 28 29A 29B 565 564 R Qty Item 34 46 47 48 363 fc 447 450 004111 16mm spare...

Page 12: ...spare 4111 spare 4111 o 4110 466 0 spare spare rwi NMI 411 spare spare 461 spare spare Qty Item 21 23 22 IVO spare spare spare 0 spare spare x4 x1 1 927 0 0 0 0 Qty Carton Spacer 95 T100 300 140cm 101...

Page 13: ...41h AltaN 0 111111N 0 0 Illim MI111110 _ 4 v4 00 4_101116 8 14 000 E41 lilio 7 qtwollo oolooz AIN A ail II 401 i i 41 1 li0 44110t 0 NIIII 01010 NIIIIN010P 245CM1961 365 Ili 1433 4...

Page 14: ...84511 846111 85511 81711 847 4 111111i 1111 824 846 II PP 824 856 _...

Page 15: ...924 x10 2 C C...

Page 16: ...3 0 Front 90 0 Back 90...

Page 17: ...848 x2 849 x2 847 IIII7ilikihhhh 849 848 ik 849 6 0...

Page 18: ...816 x2 x1...

Page 19: ...0 CNI X IA t I k 11 i SiS 0...

Page 20: ......

Page 21: ...1 o x4 0 x6 8 1 a...

Page 22: ...x6 x9 8 354 1001e001110 L 0 N 835 0Nik 0 23 836 2 835 835...

Page 23: ...10 Carton Spacer 0...

Page 24: ...x 1 00 00 00 00 00 00 00 00 1II...

Page 25: ...12 0 6 O 843 l 1 566 1 566 _ 2 566...

Page 26: ...0 x1 566 x2 6 13 14...

Page 27: ...x5 15 ell 1 11111 020 Now21 841 840 O...

Page 28: ...x2 1 16 znr Yi_rv CJ...

Page 29: ...x5 K4 17...

Page 30: ...410 4 0 Now O e e Co...

Page 31: ......

Page 32: ......

Page 33: ...Xi 21 1X2 563 cit Er 809 563...

Page 34: ...II 566 566 566...

Page 35: ...23 oo...

Page 36: ...x2 x2 24...

Page 37: ...x1 47 x2 46 x2 363 x1 447 x6 x2...

Page 38: ...L 2 0 x4 x1...

Page 39: ...27 x16 0 465 464 2 422 x2 2 2 0 464 x2 C C x4...

Page 40: ...559 x1 28 r28 111 O ____ 0 x4 Click N 4 _ 29B Click...

Page 41: ...x 8 66 x 8 462 x4...

Page 42: ...463 x4 30 _W...

Page 43: ...31 0 1 1 IN I 4 1 not I...

Page 44: ...461 x4 66 x8 411 x4 04 256 x4 32...

Page 45: ...__ HSfld HSfld EE 17x LZ6 89 X 6917 tix 9x 6917...

Page 46: ......

Page 47: ......

Page 48: ...36 1 Omm...

Page 49: ...37 s _ lyV...

Page 50: ...N 0 0 0 0 N r 114...

Page 51: ...461 x 8 466 x 8 98B x 2 39...

Page 52: ......

Page 53: ...l Palram garantiert dass das Produkt fur einen Zeitraum von 5 Jahren ab dem Kaufdatum frei von Mangeln in Material und Verarbeitung wird und den Definitionen Begriffen und Bedingungen die in dieser Ga...

Page 54: ...e majeure qui comprend mais nest pas limite par la grele la tempete une tornade un ouragan un blizzard une inondation ou les effets d un incendie 1 4 Cette garantie est nulle si des parties de la stru...

Page 55: ...e Palram Applications 1995 Ltd Virksomhedsregistreringsnummer 512106824 registreret pa adressen Teradion Industrial Park M P Misgav 20174 Israel Palram garanterer at Produktet ikke lider af materielfe...

Page 56: ...ea definitiilor si a termenilor si conditiilor din prezentul certificat de garantie 1 Conditii 1 1 Prezentul certificat de garantie este valabil doar dace Produsul a fost instalat curatat manipulat si...

Page 57: ...1 1E inv Eimpaan TWV opicrpray TOUC opouc Kai TIC npounoetcraic 1TOU EpitEptExoviat OTIV naponcra ayynnan 1 EUVEITIKEc 1 1 AUT11 ayynnan icrxnai novo QV TO npolov EyKOBIGTOTC11 KCIOCIpl ETC11 mancrin...

Page 58: ...rael Palram garandeert dat het product vrij is van materiaal en fabricagefouten voor een periode van 5 jaar vanaf de oorspronkelijke datum van aankoop door de definities en voorwaarden van deze garant...

Page 59: ...R NINGUNA PERDIDA DANO COSTE 0 GASTO RESULTANTE DE CUALQUIER USO DEL PRODUCTO PARA CUALQUIER PROPOSITO QUE NO ESTE RECOMENDADO POR LAS INSTRUCCIONES ESCRITAS 0 QUE NO ESTE PERMITIDO POR CUALQUIER LEGI...

Page 60: ...NALATI CEL NINCS AZ UTMUTATOBAN IRASBA FOGLALVA ILL HA ATERMEKET ATORVENYEK VAGY ELOIRASOK ERTELMEBENTILOS HASZNALNI AZON A TEROLETEN AHOVA TELEPITETTEK Garanzia limitata 5 anni Palram Informazioni su...

Page 61: ...om r V att AVARAI Z V att b 2tiO WOOV att MODEAffilfrOiNV 11Z L1Y c o takb ligAiVA171 liniat 11iNE igt IIMAlit 6 1 RoD zz 4 100 1 RoDt 3 2 HoD Zz IIMAtV7toliMAidEt8o 20 5 80 2 Ho Y2 3 3 Ro Zz IIMAtV7t...

Reviews: