DIS - 5
<Lines binding completed figure at rotating eyepiece to downward>
Tape this place.
Tape at the root of
anode cap
(Coil 2 times).
Confirm that line does
not catch the barrier
when rotated.
Gray line must be
outside of the anode
line.
Coil up green and yellow lines
from CRT at gray line 2 times
clockwise seen from this side.
Place lines of EVF cable by
pushing between electrolysis
condenser.
Fix red/blue lines from
CRT by taping up the
root of the lines. Then
insert into connector of
Rear C.B.A. after coil up
1 time at the CRT.
Summary of Contents for AG-VF5P
Page 1: ...ORDER NO BSD0109M908 D20 D21 1 5 Electronic View Finder AG VF5P E MC 1 ...
Page 9: ...PRT 2 MECHANICAL COMPONENT ASSEMBLY ...
Page 28: ...BLOCK DIAGRAMS CONTENTS EVF BLOCK DIAGRAM BLK 1 ...
Page 29: ...EVF BLOCK DIAGRAM BLK 1 ...
Page 30: ...EVF BLOCK DIAGRAM BLK 1 ...
Page 43: ...PRT 2 MECHANICAL COMPONENT ASSEMBLY ...
Page 57: ...BLK 1 EVF BLOCK DIAGRAM ...