Page 1-2
1-1
Outline of Maintenance
This machine automatically estimates the time for the regular maintenance by the period time set in
advance and the run time, and informs it to the user.
Enter the maintenance end after it to save the operation date in the history.
You can use the information to estimate the next maintenance period.
1-1-1
Checking the Operating Period, Contents and History Information
When 90% of the period time is passed, the
item blinks in green on the “Main Menu”
screen.
When the period is over, it does in yellow.
[The left screen shows three items to indicate
the position on the screen.]
1.
Press
Machine
parameter
.
• The “Machine Parameter Menu” screen
appears.
2.
Press Machine mainte .
• The “Machine Maintenance Menu” screen
appears.
To the next page
444C-E-MMA01-A01-05
3Y3C-104E
Run time is added to that of previous
maintenance.
Checking operation
Maintenance
Renewal of history
Normal display
Item blinks in green.
Item blinks in yellow.
Normal display
User
Screen
Machine
90 % of periodic time is passed.
Periodic time is passed.
Next maintenance period is automatically
estimated.
Run time is summed up.