Section 400-Programming
Chapter 4. Ringing and Hunt Groups (FF4)
DBS-2.3/9.2-400
DBS Manual - Revised April 2000
Page 4-29
CO Delayed Night 2 Ring Assignments
Software Version: CPC-AII and CPC-B, Version 7.0 or higher
Address: FF4 9# 2# (ExtPort)# (Trunk)# (0 or 1)#
Description
This program assigns delayed ringing to extensions for unanswered calls on
specific trunks during “Night 2” mode. Delayed ringing is when an
unanswered incoming call starts ringing at another extension after a certain
period of time (the first extension will stop ringing).
Programming
Related Programming
Delayed Ring: FF1 2# 1# 23# (0 or 1)#
CO Delayed Ring Timer: FF1 3# 26# (0-15)#
CO Night 2 Ring Assignments: FF4 9# 1# (ExtPort)# (Trunk)# (0 or 1)#
Notes
Attendant Interactions.
If the Primary Attendant is assigned delayed
ringing, the Attendant Overflow feature will be disabled. Also, if the Delayed
Ring function is enabled and no extensions are assigned or capable of ringing
(DND, unplugged, etc.), the ringing line will automatically ring the
Attendant.
Timing For Delayed Ringing.
Delayed ring timing -- the period of time that
passes before the system transfers the unanswered call -- is controlled by the
CO Delayed Ring Timer
(FF1 3# 26#).
FF4 9# 2# (1-73 or 1-145)# (1-64)# (0 or 1)#
Trunk Number
Extension Port
0=Trunk does not ring.
NOTE:
Use port 73 (for single-cabinet systems)
or port 145 (for double-cabinet systems) to assign ringing
to an external paging or Universal Night Answer (UNA) device.
1=Trunk rings.
Summary of Contents for DBS-2.3-400
Page 24: ...Intro 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...
Page 46: ...Page 1 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...
Page 250: ...Page 2 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...
Page 364: ...Page 5 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...
Page 428: ...Page 9 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...
Page 434: ...Page 10 2 DBS Manual Revised April 2000 DBS 2 3 9 2 400 ...