Chapter 5. Peripheral Equipment
Section
Figure S-10. Cable punch-out
Failure Unit
3. Mount the PFU on the wall using the three screws provided with the unit.
(See Figure 11.
j
.
4. Connect
the
trunks from the central office to the PFU.
5.
Connect the
to the AEC extension ports on the PFU.
6. Connect the trunks from the DBS to the PFU.
7. Connect the AEC ports from the DBS to the PFU.
When a power failure occurs, AEC “A” is switched to Trunk “A,” AEC
is switched to Trunk “B,” and so on.
8. Connect the
and GND terminals from CN2 on the DBS Connector
Panel to the PFU.
9.
Install the cover on the PFU.
5-20
DBS Manual Issued
DBS-70-300
Summary of Contents for DBS 40
Page 10: ...List of Tables Section 300 installation X DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 13: ...1 2 DES Manual Revised 4 3 96 DES 70 300 ...
Page 19: ...DES Manual Issued 8 l 95 DES 70 300 ...
Page 28: ...3 2 DBS Manual Issued 8 l 95 DES 70 300 ...
Page 47: ...4 2 DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 91: ...5 2 DBS Manual Issued 8 l 95 DBS 70 300 ...
Page 127: ...6 2 DBS Manual Issued 8 l 95 DBS 70 300 ...