1 INTRODUCTION
4
1.1.
INTRODUCTION
4
1.2.
ABOUT LEAD FREE SOLDER (PbF)
4
1.3.
IMPORTANT NOTICE 1: (Other than U.S.A. and
Canadian Market)
4
1.4.
HOW TO DEFINE THE MODEL SUFFIX (NTSC or PAL
model)
5
2 SAFETY PRECAUTIONS
7
2.1.
GENERAL GUIDELINES
7
2.2.
LEAKAGE CURRENT COLD CHECK
7
2.3.
LEAKAGE CURRENT HOT CHECK (See Figure 1.)
7
3 PREVENTION OF ELECTRO STATIC DISCHARGE (ESD) TO
ELECTROSTATICALLY SENSITIVE (ES) DEVICES
8
4 HOW TO RECYCLE THE LITHIUM ION BATTERY(U.S. ONLY)
8
5 CAUTION FOR AC CORD (For EB/GC/SG)
9
5.1.
INFORMATION FOR YOUR SAFETY
9
5.2.
CAUTION FOR AC MAINS LEAD
9
6 HOW TO REPLACE THE LITHIUM BATTERY
10
6.1.
REPLACEMENT PROCEDURE
10
7 OPERATING GUIDE
12
8 SERVICE NOTES
15
8.1.
WHEN REPLACING THE MAIN C.B.A.
15
8.2.
SERVICE POSITION
15
8.3.
HOW TO DISCHARGE THE CAPACITOR UNIT
17
8.4.
CLEANING LENS, VIEWFINDER AND LCD PANEL 17
8.5.
NOTE FOR SCHEMATIC DIAGRAM
17
9 ADJUSTMENT PROCEDURES
18
9.1.
SERVICE FIXTURE AND TOOLS
19
10 ERROR CODE MEMORY FUNCTION
20
11 CONFIRMATION OF FIRMWARE VERSION
24
12 DISASSEMBLY PROCEDURE
25
12.1. DISASSEMBLY FLOW CHART
25
CONTENTS
Page
Page
2
DMC-FZ5PP / DMC-FZ5PL / DMC-FZ5EB / DMC-FZ5EG / DMC-FZ5EGM / DMC-FZ5GC / DMC-FZ5GD / DMC-FZ5GK / DMC-FZ5GN / DMC-FZ5GT / DMC-FZ5SG