9
8. Insert fan body and slide into adaptor assy with some
TM
strength, untill the flange overlaps the Flex-Z Fast
bracket. Secure the fan body to Flex-Z Fast bracket
by using 2 self-drilling screws, plug connector to
receptacle and secure the fan body to adaptor by
using machine screw (M4X8). (Fig.6)
Mount junction box cover
are not pinched.
7. Refer to wiring diagram on page 5.
Follow all the local electrical safety
codes as well as the National Electrical
Code (NEC). Using UL approved wire
nuts, connect house power wires to
ventilating fan wires. (Fig.5)
Fig.5
INSTALLATION (NEW CONSTRUCTION) CONTINUED
CA U TIO N
BLA CK
W HITE
RED
Wire nuts
Junction
box
L
N
120 VAC
LINE IN
Switch box
Conduit
Earth ground
Earth ground
Live (Fan)
Neutral
Two red wires (Connect to a
general manual wall switch)
TM
Fig.7
Unit: inches (mm)
After finishing the ceiling job, fill gap between flange
and ceiling with caulk or other sealant to prevent air
leakage.
10 1/2
(270)
10 1/2
(270)
Ceiling
Secure machine screw (M4X8) to the
suitable hole and not touch the Flex-Z
Fast bracket. Please fix the screw
carefully to avoid screw slip teeth.
TM
9. Finish ceiling work. Ceiling hole should be aligned
with the inside edge of the flange. (Fig.7)
CAUTION
CAUTION
The claw of connector must latch the rib
completely.
IMPORTANT:
Replace the sensor cover before the installation
(only for plug-in Motion sensor module FV-MSVK1). (Fig.9)
Keep on pressing the clasps when removing the ornamental cover.
Insert the sensor cover (attachment for FV-MSVK1) into slot.
Gloves
Fig.9
Keep on pressing the clasps when removing the ornamental cover.
Insert the sensor cover (attachment for FV-MSVK1) into slot.
Ornamental cover
Sensor cover
English
GREEN
carefully so that lead wires
Ceiling
Fig.8
Clasp
Motion Sensor
11. Insert the grille mounting spring on the wiring
side into the slot. (Fig.8)
10. Adjust Pick-A-Flow switch.(Refer to indication on
FEATURE)
(FV-MSVK1 only)
Machine
screw
(M4X8)
Fig.6
2 Self-drilling
screws
Plug connector
Receptacle