Note
Setup the Power Measuring Unit
Installer Tasks
Connection method for power and CT.
8
Connection method
for power and CT.
9
Connection method for power
and CT with solar generation
and storage battery system.
10
5. Pass the CT Cable through from the Power Measuring Unit until
sufficient space is available for installation of the main breaker CT.
6. Connect the CT to the three-way split side of the CT Cable.
7. Clamp the CT on the power wire as per the number of current phases
stated on the CT Cable.
8. Connect the Power
Measuring Unit side
of the CT Cable to
the CT connector
labelled MAIN on
the Power Measur-
ing Unit.
Do not remove
any other covers.
Once the CT cable is
connected, tapping
the “Next” button
displays a screen with
an option for whether
a solar generation or
storage battery
system is present.
Skip to
11
for Yes,
or
12
for No.
* Ensure that there is no branch wire between the CT measurement point and
the power meter, otherwise accurate energy measurement will not be possible.
* The CT cannot provide accurate measurements if the current phase installation
positions differ.
* The CT has a polarity. When clamping the CT to the power wire, ensure you
follow the direction label on the CT.
* Do not use the CT in a location with wiring temperatures over 50°C.
Note
Tap the “Next” button.
STEP2
17