Foam tape. (already fitted)
PAGE 21
SMED SEMI VERTICAL - HUSSMANN
CAUTION:
Take care if removing
Shelves when joining the cases
Shelf light leads may need to be
disconnected
CAUTION:
Case joining bolts should
only be tightened when the cases have
been positioned as close together as
possible.
All cases must be sealed against water and air leakage
before joining.
To seal the joins:
1. Remove the shelving, racks, mirrors etc, from the
end bays, where necessary. Cases must not be po-
sitioned in areas that may be subject to heat or air
currents such as ventilation ducts, open doors or
windows, direct sunlight, electric fans or ovens, etc.
2. Cases joints must be air tight to prevent formation
of ice or condensation. Foam tape has already
been fitted to the end of the case. Check to ensure
sealing integrity can be achieved, remedy if foam
tape has been damaged, before final joining of
both cases together.
To join the cases
1. Align the canopy by inserting the “multiplexing
rods” into the aluminium canopy decoration panel
2. Draw up the required case tightly against the case
already in position.
3. Ensure that the case is level, from front to back and
side to side, with the existing case.
4. Insert the joining bolts, found in the blister pack,
into the end holes and tighten
3.6
SEALING CASE JOINS
3.7
JOINING THE CASES
FIGURE 3S
FIGURE 3T
INSTALLATION