PAGE 36
SMED SEMI VERTICAL - HUSSMANN
HAZARD
CONTROL MEASURES
Electrical -
Replacement of electrical components
Request a service call. Electrically isolate cases before
works
Ergonomic -
Moving/ positioning/ adjusting cases
Staff must be trained in the correct procedures for setting
up cases and ergonomic practices. PPE must be worn
Falling -
Connecting sensor probe wiring during
installation
Use of barriers & fall arrest systems as appropriate &
in accordance with State & Territory Legislation. Safe
working at heights
Entanglement -
Contact with fans when cleaning
Electrically isolate cases before work is carried out. Staff
training,
Electrical -
Potential for electric shock when cleaning
electrical fittings and components
Electrically isolate cases before work is carried out. Staff
training, RCD. Keep electrical connections dry at all times.
Falling -
Climbing on shelves
Staff must be trained in OH&S procedures. MUST not
climb on shelves or cases.
Crushing -
Hands or fingers may become pinched or
crushed during the positioning of base trays, shelves &
stock
Staff must be trained in the correct procedures for setting
up cases and ergonomic practices
Slipping -
Drain may leak or become blocked causing
water spillage
Visual Inspection and regular maintenance. Request
service call when necessary.
Cuts and stabbing -
Potential for cuts caused by
damaged or missing parts
Visual Inspection and regular maintenance. Request
service call when necessary. PPE must be worn when
handling broken or damaged parts.
7.1
APPENDIX 1 -
Wiring diagrams – Supplied with each case
7.2
APPENDIX 2 -
Risk Analysis
APPENDIX