Page 6-4
193C-E-OMA06-A01-01
6-2
Supplying Solder
When you start production, check the printing direction of squeegee, then put the solder whose
quantity is specified by engineer onto mask by using spatula, etc.
∗
If solder is left as it is for hours, it dries up and becomes unavailable. So, supply solder just before
starting production.
The method of supplying solder during production varies depending on ON/OFF setting of
“AutoSolderSupply” of function switch and “whether or not the automatic solder feed unit (option) is
installed.”
This section describes how to supply solder during production.
6-2-1
Case that “AutoSolderSupply” Is OFF
When “Paste count” is “0”, machine comes to a cycle stop with a buzzer. Supply solder in the
following procedures.
1.
Press
.
• The buzzer stops.
2.
Turn OFF the servo switch on operat-
ing panel.
193C-EOp-PrCs-002
To the next page
OFF ( ) ON ( )
SERVO
Summary of Contents for KXF-193C
Page 2: ......
Page 28: ...Page 28 193C E OMA00 A04 01 MEMO ...
Page 64: ...Page 4 6 193C E OMA04 A01 01 MEMO ...