Page 1-11
1
INST
ALLA
TION
2) Placing the machine
Place the machine along the reference line. Adjust the machine position for the smooth and the
height of transfer to the reference machine.)
3) Surrounding equipment
Install the warning indicator, blower, and atmosphere temperature controller according to section
1-3
. For the line specifications, connect the signal cable refering to section
1-1-6
.
4) Setting the proper level
(1) Remove the rear cover.
(2) Remove the setting bolt for the Y-axis ball screw cover, and draw the cover backward.
(3) Install the level and adjust all of 4 level pads to be under a scale (0.02 mm / 1000 mm).
(Adjust in X and Y directions.)
(4) Fix them by tightening the lock nuts. (Ensure that it is under a scale after fixing again.)
Adjustment bolt
Locking nut
Installing Procedure
Rear cover
Y-axis ball screw
1F4C-AA00
1B4C-806E
1D4C-836E
1D4C-840E
Level pad
Level
1F4C-E-IMA01-A01-01
1F4C-803E
Y
X
Y-axis motor
∗∗∗∗∗
The setting positions are illustrated above.
(Y-axis ball screw support side)
Set each of them in X and Y directions.
Level setting positions