EN-
54
EN-
55
English
Installing the appliance as fl ush-fi tting
KY-T937VL can be fi tted fl ush when installing.
Flush-fi tting
■
Only suitable for installation on heat and water resistant worktops such as
marble, natural stone, solid wood (if cut out edges are sealed).
■
Mount onto other types of worktops only with the recommendation of the worktop
manufacturer.
■
Remove the cushion from the underside of the appliance before fl ush fi tting.
■
The internal width of the base unit must be at least as wide as the internal
cut-out width for the hob. This is to ensure that the casing can be easily removed
for maintenance.
■
Before sealing in, test that the appliance works. Grout the perimeter using a heat
resistant silicone. Smooth the seal with a suitable fi nishing product.
Follow the silicone instructions and do not turn on the appliance until the silicone
is completely dry.
CAUTION
■
Please observe the diagrams for the cut-out dimensions in granite
and marble worktops.
■
Using unsuitable silicone may cause permanent colour changes to
marble worktops.
Uninstalling the appliance as fl ush-fi tting
■
Disconnect the appliance from the mains.
■
Remove the silicone seal from the perimeter with a suitable tool.
■
Push the appliance upwards from below to remove it.
CAUTION
Do not try to remove the appliance by prying it out from above.
490
870
904
17
5.5
R3
R3
29
524
(measurement: mm)
Upon completing installation, check and mark off the following items.
I hereby certify that installation has been completed.
Signature of installer
Checklist
Checked
Appearance
■
Ensure that the appliance is not tilted.
■
Is the top plate clean?
Electrical
work
■
Is the power supply a single-phase (220-240 V ~), or a
three-phase (380-415 V 3N~)?
■
Has the earth been installed?
■
Has the earth leakage circuit breaker been installed?
Electrical
testing
1. Touch
to turn on the main power.
■
Does the main power light illuminate?
2. Touch the following areas to check function of
each cooking zone:
■
Left front
■
Left middle
■
Left rear
■
Middle left
■
Middle right
■
Right front
■
Right middle
■
Right rear
■
Make sure to turn off each cooking zone and the main power switch after
performing electrical testing.
■
Hand the Operating / Installation Instructions to the customer.
Post-installation Checklist
Does
- - -
- - -
fl ash?