51
3-2-2 Termination procedure
1.
Turn OFF the laser pumping.
• PC configuration software control: Click “Laser pumping ON/OFF” of the
“Laser Marker Operation” tool.
• Remote control: Turn off the laser pumping by LASER SUPPLY IN (X6) of I/
O terminal or by the laser pumping command (LSR).
2.
Overwrite the data as needed.
Click “Save” or “Save as” in the file menu.
If turning off the power of the laser marker without saving the file under dealing,
the data being edited is deleted. Be sure to check the file saving before turning
off the power.
For details on the operation method, please refer to the Laser Marker NAVI
smart Operation Manual.
3.
Disconnect the online connection.
Refer to “3-3-4 How to disconnect online connection” (P.58).
ワㄐㄕㄊㄆ
• Do not turn the laser marker power OFF while being connected to online. When the power gets turned OFF during data
communication, it may cause the data to corrupt or system failure.
4.
Exit from the Laser Marker NAVI smart.
Click “Exit” in the file menu.
5.
Turn OFF the key switch of the controller and remove the system key.
Please have the safety manager store the system key properly.
ヱヰヸユ
ン
ON
OFF
ME-LPGS-SM-8
Summary of Contents for LP-GS Series
Page 17: ...1 Product Overview ME LPGS SM 8 ...
Page 32: ...2 Laser Marker Installation ME LPGS SM 8 ...
Page 48: ...3 Operation Method ME LPGS SM 8 ...
Page 68: ...4 External Control Using I O ME LPGS SM 8 ...
Page 107: ...5 External Control by Communication Commands ME LPGS SM 8 ...
Page 116: ...6 Link Control with External Devices ME LPGS SM 8 ...
Page 141: ...7 Maintenance ME LPGS SM 8 ...
Page 161: ...161 MEMO ME LPGS SM 8 ...
Page 162: ...Troubleshooting ME LPGS SM 8 ...
Page 186: ...Index ME LPGS SM 8 ...
Page 189: ......
Page 190: ... Panasonic Industrial Devices SUNX Co Ltd 2014 2019 April 2019 ...