45
2-6 Control Sample
⿎
To switch the file and start marking
Change the file to be
marked
1. Laser pumping (ON)
LSR command
Remote mode ON
Remote mode OFF
2. File selection by number
FNO command
3. Shutter open
SHT command
4. Status checking
STS command
5. Marking trigger
MRK command
6. File selection by number
FNO command
7. Shutter close
SHT command
8. Laser pumping (OFF)
LSR command
Marking trigger ready: ON
Yes
Yes
No: Finish
operation
No: Mark the
same file
No.
*1 : From sending the laser pumping on request to completion of laser pumping, the following time will be required.
• LP-GS series: about 8 to 15 seconds
• LP-RC series: about 10 seconds
• LP-RF series: about 7 seconds
• LP-RV series: about 1 second
*2 : Commands from No. 2 to No. 4 above chart can be sent right after turning on laser pumping (without waiting for the
laser pumping completion).
*3 : There is a delay time of around 200ms to max. 1 second from sending shutter open/close command for the actual
shutter open/close operation time.
Besides, with LP-RC series for the first operation of opening shutter after the laser pumping on, it takes around 300ms
to max. 4 seconds.
*3
*1, *2
ME-LP-GS-SR-COMP-3
Summary of Contents for LP-GS Series
Page 11: ...1 Preparation of Command Control ME LP GS SR COMP 3...
Page 26: ...2 Communication Control Basics ME LP GS SR COMP 3...
Page 50: ...3 Data Format for Each Command ME LP GS SR COMP 3...
Page 136: ...136 MEMO ME LP GS SR COMP 3...
Page 137: ...Troubleshooting ME LP GS SR COMP 3...
Page 163: ...Character Code Table ME LP GS SR COMP 3...
Page 176: ...Index ME LP GS SR COMP 3...
Page 178: ...178 W Warning 154 ME LP GS SR COMP 3...
Page 179: ......
Page 180: ...Panasonic Industrial Devices SUNX Co Ltd 2014 2019 April 2019...