16
1-2-2 Startup of Laser Marker
1.
Turn ON ( | ) the key switch of the controller.
(Insert the key and turn it toward ON ( | ) side.)
The main indicator flashes in green, and changes into lighted-
up status after approx. 75 seconds.
Notice
•
Since the ON/OFF operation of the key switch puts load to laser
marker, do not turn off the power supply until completing the
system start.
•
In case of turning ON the power supply after turning OFF, leave
the interval at least 5 seconds between ON and OFF.
2.
If the language selection screen appears at the start-up,
select the language to be used for the display and press
[SET].
To skip this screen from the next start-up, check “Don’t display this
massage on next start-up”.
3.
The operation screen is appeared after the system is started.
Turn the key switch
toward ON ( | ) side
MAIN
Flash in green
i
Light up in green
ME-LPMSZ-OP-7
Summary of Contents for LP-M Series
Page 11: ...1 Basic Operation Procedure ME LPMSZ OP 7 ...
Page 76: ...76 MEMO ME LPMSZ OP 7 ...
Page 77: ...2 Description of Operation Screen ME LPMSZ OP 7 ...
Page 102: ...102 Symbol ME LPMSZ OP 7 ...
Page 255: ...Troubleshooting ME LPMSZ OP 7 ...
Page 276: ...Appendix ME LPMSZ OP 7 ...
Page 304: ...Index ME LPMSZ OP 7 ...
Page 307: ...No 9000 0063 56V ...
Page 308: ... Panasonic Industrial Devices SUNX Co Ltd 2013 2019 March 2019 9000 0063 56V ...