Screw Order
① → ② → ③ → ④ → ⑤
Torque
20.0 ± 1.0 N
・
cm
6.2.2.5. Installation of Mount Rubber
1. Install Mount Rubber.
6.2.2.6. Installation of L Mount
1. Install L Mount.
2. Tighten 5 screws (E) in numerical order by using the torque driver with specified torque.
Screw (E)
L Mount
③
④
⑤
①
②
Mount Rubber
Screw (E)
x
5
L Mount
7
Screw (E)
Screw (E)
20