4
.
Gas charge
4.1
Evacuation
②
Preparations: Dedicated GM, Refrigerant Cylinder, Bottle Cap, Powerful Vacuum Pump, Scale
(Electronic Weighing Scale), Charge hose, branching tool, tool
Procedure : After operating the powerful vacuum pump with the refrigerant cylinder on the scale,
Open the valve in the following order and evacuate to the refrigerant cylinder.
VS
⇒
VR
⇒
VG
⇒
VC.
Vacuuming time: about 1 minute with a vacuum pump with capacity of 300 L / min
(Standard: vacuum degree 3 Torr or less)
4.2 Completion of evacuation
Procedure : Specified time (about 1 minute) after evacuating,
shut the valve in the following order and stop the pump.
VC
⇒
VG
⇒
VR
⇒
VS
Remove the vacuum pump from the hose.
Powerful vacuum pump
Low pressure side
service valve
Main valve
Scale
R
e
fri
ger
a
nt
c
y
linder
VS
Charge hose
Valve state
open
shut
VC
○
VG
○
VL
○
VH
○
VR
○
VS
○
Main
○
SVL
○
Valve state
open
shut
VC
○
VG
○
VL
○
VH
○
VR
○
VS
○
main
○
SVL
○
SVL
VR
VG
VL
VC
VH
Refrigerant
port
Vacuum
port
High pressure
port
Low pressure
port
Dedicated GM
-46-
Summary of Contents for MDF-DU502VH
Page 8: ...Dimension MDF DU502VH 5 ...
Page 9: ...MDF DU702VH 6 ...
Page 17: ...Wiring Diagram 14 ...
Page 18: ...main Circuit Diagram 15 ...
Page 19: ...power 16 ...
Page 20: ...USB 17 ...
Page 73: ...WIRING YG Y Y GR B G W W W Y G R BL Y W R R BL R OR B BL R OR B Y W Y G Y G R BL 70 ...