9
3.5.
Access Washing Pump
1. Disconnect power.
2. Remove bottom board.
3. Label and disconnect the 2 terminals to the motor wire connector.
4. Remove the clamp fastening the interconnect hose to the sump.
Caution: The clamp is easily damaged during removal and can’t be reused. Replace the old clamp with a new universal
clamp.
5. Disconnect the ground wire from the wash pump motor assembly.
6. Remove the motor pump assembly from the dishwasher.
7. Reverse above procedures to install.
3.6.
Access NTC
1. Remove bottom board.
2. Remove two screws securing the NTC to sump (shown in above picture).
3. Take out NTC.
4. Reverse the above procedure to install.
3.7.
Access Flowmeter
1. Remove the baseboard, top panel and left side panel.
2. Remove the plastic nut inside tub, which secures the air breaker to tub.(Because flowmeter is integrated into air breaker,
replace air breaker if flowmeter has failure.)
3. Disconnect the wire and remove clamp fastening hose to air breaker.
4. Take out air breaker.
5. Reverse the above procedure to install.
Summary of Contents for NP-6R2MUQNZ-NZ
Page 11: ...11 4 Block Diagram 4 1 Water Circuit ...
Page 13: ...13 5 Troubleshooting 5 1 Location ...
Page 32: ...32 5 13 Inspection 5 13 1 E1 tree ...
Page 33: ...33 5 13 2 E3 tree ...
Page 34: ...34 5 13 3 E4 tree ...
Page 36: ...36 5 14 Troubleshooting ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 40: ...40 ...