B. Install the Mechanism Chassis and Cassette Up Ass’y straight
onto the Main C.B.A. so that the Sensor LED clears the hole in
the Mechanism Chassis and that 2 Connectors (P4001, P6201)
are aligned and seated securely.
5. Flat Cable solder points on the Cylinder and AC Head
Solder the Flat Cables. Then, install the Shield Plate as shown.
Fig. D3
6. Installation of Cassette Up Ass’y
A. Confirm that the Locking Tab under the Cassette Up Ass’y is in
Hole on the Mechanism Chassis when installing the Cassette
Up Ass’y. Then, slide the Cassette Up Ass’y towards the back.
B. When installing 2 Screws (502), slide the Holder Unit (Refer to "
METHOD FOR LOADING/UNLOADING OF MECHANISM
" in
Service Notes) to tighten screws. Then, slide it back to the
20
Summary of Contents for NV-SJ4130PN
Page 6: ...Fig 1 4 Fig 1 5 6 ...
Page 22: ...5 2 3 EJECT Position Confirmation Fig J1 2 22 ...
Page 48: ...10 2 MECHANISM BOTTOM SECTION 48 ...
Page 49: ...10 3 CASSETTE UP COMPARTMENT SECTION 49 ...
Page 50: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 50 ...
Page 51: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 51 ...
Page 56: ...11 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 56 ...
Page 96: ......
Page 97: ......