3. If the reading is out of specification, make sure that there is no
dust or foreign material between the Brake Pad of Tension Control
Arm Unit and the S Reel Table.
After cleaning, the reading of tension measurement is still out of
specification, replace the Tension Arm Unit and the Tension
Control Arm Unit.
Fig. M2-2
Note:
1. Be sure that the three probes of the meter are all in solid contact
with the tape, but not touching any other parts of the mechanism.
2. It is recommended that measurements should be repeated at least
three (3) times because the tension meter is very sensitive to
external vibrations.
7.2.2.2. TAPE INTERCHANGEABILITY ADJUSTMENT
Note:
To perform these adjustment/confirmation procedures, set the
tracking to the neutral position.
Equipment Required:
Dual Trace Oscilloscope
46
Summary of Contents for Omnivision PV-C2542
Page 22: ...6 1 2 Disassembly Method Fig D2 22 ...
Page 23: ...Fig D3 23 ...
Page 24: ...6 1 2 1 Notes in chart 1 Removal of VCR Unit Fig D4 24 ...
Page 28: ...6 2 2 Inner Parts Location Fig J1 1 28 ...
Page 29: ...6 2 3 EJECT Position Confirmation Fig J1 2 29 ...
Page 30: ...6 2 4 Full Erase Head and Cylinder Unit Fig J2 30 ...
Page 70: ...70 ...
Page 73: ...11 2 MECHANISM BOTTOM SECTION 73 ...
Page 74: ...11 3 CASSETTE UP COMPARTMENT SECTION 74 ...
Page 75: ...11 4 CHASSIS FRAME SECTION 1 75 ...
Page 76: ...11 5 CHASSIS FRAME SECTION 2 76 ...
Page 77: ...11 6 PACKING PARTS AND ACCESSORIES SECTION 77 ...
Page 84: ...121 LSPG1279 PACKING CASE PAPER F 6 84 ...
Page 97: ...R5317 ERDS2TJ101 CARBON 1 4W 100 97 ...
Page 99: ...R6045 ERJ6GEYJ102V MGF CHIP 1 10W 1K 99 ...
Page 118: ...R5401 ERJ6GEYJ561V MGF CHIP 1 10W 560 118 ...