be sure to apply Silicon Grease (VFK1301) as shown. Be careful
not to touch other parts with greased portion to prevent grease
depletion.
Fig. J6-2
2. Installation of Capstan Rotor Unit and Oil Seal
A. Install the 2 Oil Seals into the Capstan Holder Unit. Then, insert
the Capstan Rotor Unit Shaft into the hole of the Capstan
Holder Unit so that shaft passes through 2 Oil Seals. Be
carefulnot to scratch the Shaft or Capstan Holder Unit.
B. Align the bottom of Oil Seal (A) with notch line (A). Align the
top of Oil Seal (B) with notch line (B).
Fig. J6-3
39
Summary of Contents for OmniVision PV-C2780-K
Page 8: ...Fig 1 3 Fig 1 4 8 ...
Page 26: ...Fig D5 6 1 2 1 Notes in chart 26 ...
Page 29: ...6 2 2 Inner Parts Location Fig J1 1 29 ...
Page 30: ...6 2 3 EJECT Position Confirmation Fig J1 2 30 ...
Page 31: ...6 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 31 ...
Page 44: ...6 3 CASSETTE UP ASS Y SECTION 6 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 44 ...
Page 81: ...81 ...
Page 85: ...11 2 MECHANISM BOTTOM SECTION 85 ...
Page 86: ...11 3 CASSETTE UP COMPARTMENT SECTION 86 ...
Page 87: ...11 4 CHASSIS FRAME SECTION 1 87 ...
Page 88: ...11 5 CHASSIS FRAME SECTION 2 88 ...
Page 89: ...11 6 PACKING PARTS AND ACCESSORIES SECTION 89 ...