1 Safety Precautions
1.1. General Guidelines
1. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or
damaged by the short circuit.
2. After servicing, ensure that all the protective devices such as insulation barriers and insulation papers shields are properly
installed.
3. After servicing, check for leakage current checks to prevent from being exposed to shock hazards.
(This “Safety Precaution” is applied only in U.S.A.)
1. Before servicing, unplug the power cord to prevent an electric shock.
2. When replacing parts, use only manufacturer’s recommended components for safety.
3. Check the condition of the power cord. Replace if wear or damage is evident.
4. After servicing, be sure to restore the lead dress, insulation barriers, insulation papers, shields, etc.
5. Before returning the serviced equipment to the customer, be sure to make the following insulation resistance test to prevent the
customer from being exposed to a shock hazard.
1.1.1. Leakage Current Cold Check
1. Unplug the AC cord and connect a jumper between the two prongs on the plug.
2. Using an ohmmeter measure the resistance value, between the jumpered AC plug and each exposed metallic cabinet part on
the equipment such as screwheads, connectors, control shafts, etc. When the exposed metallic part has a return path to the
chassis, the reading should be between 1M
Ω
and 5.2M
Ω
.
When the exposed metal does not have a return path to the chassis, the reading must be
.
Fig. 1
1.1.2. Leakage Current Hot Check (See Figure 1)
1. Plug the AC cord directly into the AC outlet. Do not use an isolation transformer for this check.
2. Connect a 1.5k
Ω
, 10 watts resistor, in parallel with a 0.15µF capacitor, between each exposed metallic part on the set and a
good earth ground such as a water pipe, as shown in Figure 1.
3. Use an AC voltmeter, with 1000 ohms/volt or more sensitivity, to measure the potential across the resistor.
4. Check each exposed metallic part, and measure the voltage at each point.
5. Reverse the AC plug in the AC outlet and repeat each of the above measurements.
6. The potential at any point should not exceed 0.75 volts RMS. A leakage current tester (Simpson Model 229 or equivalent) may
be used to make the hot checks, leakage current must not exceed 1/2 milliamp. Should the measurement is out of the limits
specified, there is a possibility of a shock hazard, and the equipment should be repaired and rechecked before it is returned to
the customer.
4
SA-AK340P / SA-AK340PC
Summary of Contents for SA-AK340P
Page 9: ...6 Accessories Remote Control FM Indoor Antenna AC Cord AM Loop Antenna 9 SA AK340P SA AK340PC ...
Page 10: ...7 Operation Procedures 10 SA AK340P SA AK340PC ...
Page 11: ...11 SA AK340P SA AK340PC ...
Page 23: ...10 3 Main Parts Location 23 SA AK340P SA AK340PC ...
Page 34: ...34 SA AK340P SA AK340PC ...
Page 40: ...12 2 Checking and Repairing of Transformer P C B 40 SA AK340P SA AK340PC ...
Page 41: ...12 3 Checking and Repairing of Panel Deck Deck Mechanism P C B 41 SA AK340P SA AK340PC ...
Page 42: ...12 4 Checking and Repairing of Power P C B 42 SA AK340P SA AK340PC ...
Page 47: ...14 2 Power P C B and Transformer P C B 47 SA AK340P SA AK340PC ...
Page 48: ...14 3 Waveform Chart 48 SA AK340P SA AK340PC ...
Page 56: ...56 SA AK340P SA AK340PC ...
Page 58: ...SA AK340P SA AK340PC 58 ...
Page 60: ...SA AK340P SA AK340PC 60 ...
Page 66: ...SA AK340P SA AK340PC 66 ...
Page 68: ...SA AK340P SA AK340PC 68 ...
Page 72: ...SA AK340P SA AK340PC 72 ...
Page 80: ...SA AK340P SA AK340PC 80 ...
Page 84: ...84 SA AK340P SA AK340PC ...
Page 85: ...21 Exploded Views 21 1 Cabinet Parts Location SA AK340P SA AK340PC 85 ...
Page 86: ...SA AK340P SA AK340PC 86 ...
Page 87: ...SA AK340P SA AK340PC 87 ...