39
Step 9 :
Place CD Mechanism Unit as shown.
Step 10 :
Connect 24P FFC at connector (CN5002) on Main
P.C.B..
Step 11 :
Connect 7P FFC at connector (CN5001) on Main
P.C.B..
Step 12 :
Check Main P.C.B. (Side A) according to the diagram
shown.
10.5. Checking of Main P.C.B. (Side
B)
• Refer to (Step 1) - (Step 11) of item 10.3.
Step 1 :
Check Main P.C.B. (Side B) according to the diagram
shown.
Summary of Contents for SA-PM250EB
Page 13: ...13 5 Location of Controls and Components 5 1 Main Unit Remote Control Key Button Operations ...
Page 18: ...18 ...
Page 20: ...20 ...
Page 22: ...22 8 3 Type of screws 8 4 Main Parts Location Diagram ...
Page 40: ...40 ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 60: ...60 ...