44
9 Service Position
Note: For description of the disassembly procedures, see the Section 8
9.1.
Checking of Panel, Main, SMPS, ALLPLAY Module with Data and CD
Interface P.C.B.
Step 1 :
Connect 7P wire at the connector (CN1101) on the Main P.C.B..
Step 2 :
Connect 9P wire at the connector (CN8003) on the Main P.C.B..
Step 3 :
Connect 10P FFC at connector (CN5001) on Main P.C.B..
Step 4 :
Connect 24P FFC at connector (CN5002) on Main P.C.B..
Step 5 :
Connect 30P FFC at connector (CN9000) on Main P.C.B..
Step 6 :
Connect 20P FFC at connector (CN9001) on Main P.C.B..
Step 7 :
Connect 13P FFC at the connector (CN8008) on the Main P.C.B. (For Tuner P.C.B.).
Step 7 :
Connect 10P FFC at the connector (CN8008) on the Main P.C.B. (For DAB P.C.B.).
Step 8 :
Connect 5P wire at the connector (CN4300) on the Main P.C.B..
Step 9 :
Connect 15P wire at the connector (CN1100) on the Main P.C.B..
Step 10 :
Connect 19P FFC at connector (CN8001) on Main P.C.B..
Step 11 :
Check Panel, Main, SMPS, ALLPLAY Module with Data and CD Interface P.C.B. according to the diagram shown.