80
Step 9 :
Upset the Main P.C.B. as arrow shown.
Step 10 :
Place the Main P.C.B. on an Insulated Material.
Step 11 :
Main P.C.B. (B side) can be checked and repaired as
diagram shown.
12.1.3. Checking and Repairing of SMPS
P.C.B.
Step 1 :
Remove Top Cabinet.
Step 2 :
Remove SMPS P.C.B..
Step 3 :
Attach 9P FFC at the connector (CN1) on SMPS
P.C.B..
Step 4 :
Attach 6P Cable Wire at the connector (CN5900) on
DAMP P.C.B..
Step 5 :
Upset SMPS P.C.B. as arrow shown.
Step 6 :
Place the SMPS P.C.B. on an Insulated Material.
Step 7 :
SMPS P.C.B. can be checked and repaired as diagram
shown.
Summary of Contents for SU-HTB550GK
Page 5: ...5 1 6 Caution for the AC Mains Lead For GS only ...
Page 7: ...7 1 8 Safety Installation Instructions ...
Page 12: ...12 5 General Introduction 5 1 About VIERA Link ...
Page 26: ...26 ...
Page 30: ...30 11 1 3 Active Subwoofer SB HWA520 ...
Page 33: ...33 11 3 2 2 Standing Position 11 3 3 Active Subwoofer SB HWA520 ...
Page 84: ...84 ...
Page 96: ...96 ...
Page 98: ...98 ...
Page 120: ...120 ...
Page 136: ...136 ...
Page 142: ...142 ...