Steps to Take Before Operation
Installation 1
Check the setup and accessories of the
concealing alkaline ionizer
Measure and adjust the
pH level of water
Check after installation
The air in the main unit is not
completely exhausted, please
drain the purified water for
5 minutes.
Installation 2
Installation 3
P.EN11
P.EN12
P.EN12
~
P.EN14
EN10
01_TK-AB50-ZEX_ZMA_EN.indd 9
2018/09/07 13:33:37