EN12
Steps to take before operation
Installation 1
Check the main
unit and supplied
accessories
P. EN13
Installation 2
Checking
the faucet
P. EN14
Installation 3
Attaching the
bypass selector
The attaching method
diff ers depending on
the shape of faucet.
P. EN15
~
P. EN17
Installation 4
Installing the
Alkaline Ionizer
P. EN18
~
P. EN19
Space where the legs of
the main unit can be placed
18 cm or more
10 cm or more
Installation 5
Checks after
installation
The air in the main unit is
not completely exhausted,
please drain the water for
about 3 to 4 minutes.
P. EN20
~
P. EN21
Installation 6
Measure and
adjust the pH level
of water
P. EN22
~
P. EN23
TK-AS700_En.indb 12
TK-AS700_En.indb 12
2022/04/14 18:17:40
2022/04/14 18:17:40