TENSION BAND ASSEMBLY REMOVAL
1)
Remove the TENSION SPRING (2) from the MAINBASE (1).
2)
Turn the DECK MECHANISM over.
3)
After separating the tab of hook "A", remove the TENSION BAND ASSEMBLY (3).
NOTE
After assembling the TENSION BAND ASSEMBLY on the MAINBASE, adjust the position of the TENSION POLE
as shown in fig.30.
Avoid getting GREASE, OIL or foreign substances on the FELT of the BAND BRAKE.
Take care not to deform tab "A" when separating it.
17
Adjustment of the tension pole position
Fig.30.
Tension band assembly removal
Fig.28.
Tension band assembly removal
Fig.29.
DATUM HOLE OF MAINBASE
DATUM HOLE OF
TENSION LEVER
Summary of Contents for TX-21GV1
Page 34: ...cp421vbl sch 1 Wed May 19 17 22 44 1999 VIDEO BLOCK DIAGRAM ...
Page 35: ...cp421abl sch 1 Wed May 19 17 19 52 1999 AUDIO BLOCK DIAGRAM ...
Page 36: ...cp421pbl1 sch 1 Wed May 19 17 21 31 1999 POWER BLOCK DIAGRAM ...
Page 48: ...39 6 3 EXPLODED VIEW OF F L ASS Y 3 576 2 7 21 9 5 ...
Page 50: ......
Page 51: ...SCHEMATIC DIAGRAMS FOR MODELS ZEICHENERKLÄRUNG FÜR MODELL TX 21GV1C TX 14GV1C ...
Page 52: ......
Page 53: ......