MECHANICAL ADJUSTMENT
When operational problems occur or the mechanism is reassembled, be sure to confirm the following instructions.
1)
Make sure that the DATUM HOLE of the CAM GEAR is aligned with the DATUM HOLE in the MAINBASE in the EJECT
mode, as shown in fig.35.
2)
Make sure that part "A" of the RELAY LEVER, when assembled in the CONNECT PLATE, is fully rotated to the left side of
"B" of the MAINBASE, and is touching boss "C" of the MAINBASE, as shown in fig.36.
CAM GEAR
F/L RACK
DATUM HOLE OF CAM GEAR
DATUM HOLE OF MAIN BASE
Datum position of relay lever and cam gear
Fig.36.
20
Datum position of front loading rack and cam gear
Fig.35.
Summary of Contents for TX-21GV1
Page 34: ...cp421vbl sch 1 Wed May 19 17 22 44 1999 VIDEO BLOCK DIAGRAM ...
Page 35: ...cp421abl sch 1 Wed May 19 17 19 52 1999 AUDIO BLOCK DIAGRAM ...
Page 36: ...cp421pbl1 sch 1 Wed May 19 17 21 31 1999 POWER BLOCK DIAGRAM ...
Page 48: ...39 6 3 EXPLODED VIEW OF F L ASS Y 3 576 2 7 21 9 5 ...
Page 50: ......
Page 51: ...SCHEMATIC DIAGRAMS FOR MODELS ZEICHENERKLÄRUNG FÜR MODELL TX 21GV1C TX 14GV1C ...
Page 52: ......
Page 53: ......