EN
FR
DE
IT
PT
GR
ES
5
Big̲PAC̲eng.indb 7
2011/02/23 13:37:46
Big̲PAC̲eng.indb 8
2011/02/23 13:37:47
9
(2) Obstructions on the front side and rear side (Left side, right
side and above the unit are opened). (Fig. 2-3)
Fig. 2-3
* For compressor replacement, 50 cm or more is required on the
front side even when using the air discharge chamber.
(3) Obstructions on the front side and above the unit (Left side,
right side and rear side are opened). (Fig. 2-4)
Fig. 2-4
In case of multiple installations
●
Provide a solid base (concrete block, 10 × 40 cm beams or
equal), a minimum of 15 cm above ground level to reduce
humidity and protect the unit against possible water damage
and decreased service life. (Fig. 2-5)
●
Use lug bolts or equal to bolt down unit, reducing vibration
and noise.
Fig. 2-5
2-2. Air Discharge Chamber for Top Discharge
Be sure to install the air discharge chamber in the field when:
●
it is difficult to keep a space of min. 1 m between the air
discharge outlet and an obstacle.
●
the air discharge outlet is facing a sidewalk and discharged
hot air annoys passers-by. (Fig. 2-6)
Fig.
2-6
2-3. Installing the Unit in Heavy Snow Areas
In locations with strong wind, snow-proof ducting should
likewise be fitted and direct exposure to the wind should be
avoided as much as possible.
■
Countermeasures against snow and wind
In regions with snow and strong wind, the following problems
may occur when the outdoor unit is not provided with a platform
and snow-proof ducting (Fig. 2-7):
a) The outdoor fan may not run and damage of the unit may be
caused.
b) There may be no airflow.
c) The tubing may freeze and burst.
d) The condenser pressure may drop because of strong wind,
and the indoor unit may freeze.
Fig. 2-7
In regions with significant snowfall, the outdoor unit should
be provided with a platform and snow-proof duct.
2-4. Precautions for Installation in Heavy Snow
Areas
(1) The platform should be higher than the max. snow depth.
(Fig. 2-7)
(2) The 2 anchoring feet of the outdoor unit should be used for
the platform, and the platform should be installed beneath
the air intake side of outdoor unit.
(3) The platform foundation must be firm and the unit must be
secured with anchor bolts.
(4) In case of installation on a roof subject to strong wind,
countermeasures must be taken to prevent the unit from
being blown over.
*1 m
or more
15 cm
or more
30 cm
or more
50 cm
or more
Without snow-
proof ducting
(Low platform)
With snow-proof
ducting
(High platform)
Min. 15 cm
or more
Air intake
Air intake
Air discharge
Air discharge
Anchor bolts
(4 pieces)
Air discharge
Big̲PAC̲eng.indb 9
2011/02/23 13:37:48
10
2-5. Dimensions of Snow / Wind-proof Ducting and
Refrigerant Tubing Space for Installation
Fig. 2-8
Min. 100
166
Unit: mm
Duct
Outdoor Unit
Min. 100
308
Outdoor
Unit
Duct
Duct
Higher than the maximum
snow depth
Air intake
Air intake
About 1/2 of the unit height
Platform (foundation)
3. HOW TO INSTALL THE INDOOR UNIT
■
High Static Pressure Ducted Type (E1 Type)
3-1. Required Minimum Space for Installation and
Service (8, 10 Types)
The installation instructions that come with the indoor unit
describe how to use it in combination with the U-200PE1E8 and
U-250PE1E8 outdoor units.
Please refer to the following when using it in combination
with the U-200PE1E8 and U-250PE1E8 outdoor units.
●
This air conditioner is usually installed above the ceiling so
that the indoor unit and ducts are not visible. Only the air
intake and air outlet ports are visible from below.
●
The minimum space for installation and service is shown in
Fig. 3-1.
1170
1100
55
55
1200
1310
(600 600)
s
Unit: mm
Fig. 3-1
Min. 600
(Space for
service)
(Suspension bolt pitch)
(Suspension bolt pitch)
Min. 700
(Space for
service)
Air suction
side
Refrigerant
tubing
Inspection
access
Electrical
component box
Min. 130
Min. 610
Drain port
Drain pan
Ceiling face
●
It is recommended that space be provided (600 × 600 mm) for checking and servicing the electrical system.
●
Fig. 3-2 shows the detailed dimensions of the indoor unit.
479
300
100
2
100 100
42
1428
1310
71
1
100
51
964
9
s
100P=900
4 - 37
s
12
10
s
100P=1000
106
44
1070
1310
67
67
11
3
(236)
364
364
1334
60
43
320
10050
178
23
209
344
1222
41
Unit: mm
Fig. 3-2
1
Refrigerant tubing joint (liquid tube ø12.7 mm) (Flare nut)
2
Refrigerant tubing joint (gas tube ø25.4 mm) (Brazing)
3
Power supply outlet
4
Drain port (O.D. 32 mm)
5
Duct connection for suction
6
Duct connection for discharge
28-ø3.5 (Holes all around)
26-ø3.5 (Holes all around)
1200 (Suspension bolt pitch)
(Hole for suspension bolt)
1170 (Suspension bolt pitch)
Big̲PAC̲eng.indb 10
2011/02/23 13:37:48
B
ig
̲P
A
C
̲e
n
g
̲m
en
tu
k
e.i
n
d
d
5
Big̲PAC̲eng̲mentuke.indd 5
2
0
1
1
/0
2
/2
3
1
3
:4
3
:3
5
2011/02/23 13:43:35
Summary of Contents for U-200PE1E8
Page 2: ......
Page 24: ... NOTE EN FR DE IT PT GR ES 22 ...
Page 46: ... NOTE 44 GB FR DE IT PT GR ES SUPPLEMENT ...
Page 68: ... ANMERKUNGEN 66 GB FR DE IT PT GR ES SUPPLEMENT ...
Page 90: ... PROMEMORIA 88 GB FR DE IT PT GR ES SUPPLEMENT ...
Page 112: ...EN FR DE IT PT GR ES 110 NOTAS ...
Page 134: ... Σημεıωματάριο 132 GB FR DE IT PT GR ES SUPPLEMENT ...
Page 156: ...EN FR DE IT PT GR ES 154 NOTAS ...
Page 157: ......