103
General
Power Source:
120 V AC, 60 Hz
Power Consumption:
58 W
Ambient Operating Temperature:
+5°C - +45°C (41°F - 113°F)
Ambient Operating Humidity:
Less than 85 %
Dimensions:
420 mm (W) x 88 mm (H) x 350 mm (D)
16-9/16” (W) x 3-7/16” (H) x 13-3/4” (D)
Weight:
8
kg
(17.6 lbs.)
Input and Output
Video Input:
1.0 V[p-p]/75
Ω
Composite video signal with 75
Ω
Automatic Termination / Looping
through (x16)
Video Output:
1.0 V[p-p]/75
Ω
Composite video signal/Looping through (x16)
Spot Output:
1.0 V[p-p]/75
Ω
Composite video signal (x1)
Multiscreen Output:
1.0 V[p-p]/75
Ω
Composite video signal (x1)
Gen-lock Output:
Black burst signal 0.43 V[p-p]/75
Ω
Audio Input:
–10 dB unbalanced, RCA standard jack
Audio Output:
–10 dB unbalanced, RCA standard jack
Extension Storage Port:
SCSI Interface 50-pin Half Pitch D-sub connector (x1)
Copy Port:
SCSI Interface 50-pin Half Pitch D-sub connector (x1)
Control Port:
25-pin Full Pitch D-sub connector (x1)
Alarm Port:
25-pin Full Pitch D-sub connector (x1)
Data Port:
RS-485 6-conductor modular jack (RJ-11)
Remote Port:
For Exclusive Remote Controller, serial interface (RJ-11)
Serial Port:
RS-232C 9-pin Full Pitch D-sub connector
10/100BASE-T Port:
10Base-T and 100Base-TX, 8-conductor modular jack (RJ-45)
(Installed Optional Network Board)
Weight and dimensions shown are approximate.
Specifications are subject to change without notice.
SPECIFICATIONS
STANDARD ACCESSORY
AC Power Cord .............................................................. 1 pc.
Rack Mounting Bracket .................................................. 2 pcs.
Screw for Rack Mounting Bracket (M4x10) ................... 4 pcs.
Absorber ........................................................................ 4 pcs.
Sleeve ............................................................................. 4 pcs.
Earth Lug ........................................................................ 1 pc.
Hard Disk Fixing Screw .................................................. 4 pcs.
Summary of Contents for WJ-HD500B
Page 26: ...26 ...
Page 27: ...27 PREPARATIONS ...
Page 40: ...40 ...
Page 41: ...41 SETUP PROCEDURES ...
Page 78: ...78 ...
Page 79: ...79 OPERATING PROCEDURES ...