12
[3] Mounting of the camera body on the ceiling mount bracket
Step 1
For the case of color CCTV camera, peel off the seal on the
top of the camera, and specify the communication method
and unit address using the DIP switches.
Refer to the Operating Instructions of the color CCTV cam-
era for how to set the DIP switch.
Put the seal back after specifying them.
Communication method: specifying with SW2
Unit address: specifying with SW1
RS485Setting
START
SW1
SW2
DIP
SW1
ON
1
2
3
4
5
6
7
8
DIP
SW2
ON
1
2
3
4
DIP switch
Seal
Camera top
Step 2
Align the flat spring with the START position.
If not, rotate the plate on the top of the camera clockwise to
align it with the "START" position.
For the case of network camera
For the case of color CCTV camera
Step 3
Engage the safety wire with the wire hook section.
Flat spring
Plate
Projections
START
S TA RT
Flat spring
Plate
Projections
Safety wire
Wire hook section
Summary of Contents for WV-Q121BS
Page 15: ...15 ...