INSTRUCTIONS CM340B
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 13 of 28
Vertical Blanking Panels - Ganging
Loosen four (4) #12-24 screws connecting vertical panel with horizontal panel, (2) at the top and (2) at the
bottom corner.
Loosen four (4) #12-24 serrated bonding screws connecting vertical blanking panel with equipment rail.
Install six (6) clip nuts on offset flange facing in towards the cabinet.
Loosely Mount six (6) #6-32 screws through adjacent vertical blanking panel to clip nuts as shown. Adjust
location of clip nuts if needed.
Before tightening any blanking panel mounting hardware, ensure that all blanking panel components are not
strained and the mounting distance between equipment rails is EIA spaced (18.31”).
Tighten #12-24 screws to torque of minimum 25 in-Lbs. Verify that the distance between equipment rails is
still EIA spaced (18.31”). Make adjustments if needed.
6-32 Screw and Clip Nut
Clip Nut
(note orientation)
6-32 Screw