INSTRUCTIONS CM340B
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 15 of 28
Rear Rail Installation (CNRC)
Install cabinet rails at three locations shown below with Bolt and Dual Nut provided. The Paint Piercing washers are used in the middle
location to bond the equipment rails to the cabinet as shown in figure 1.
Note:
Torque bolts to 14 ft.-lbs (19.0 N-m) to ensure equipment rails are bonded to the cabinet frame
Figure 1
Thread bolt
through hole
toward outside
of cabinet
Paint
piercing
washer