INSTRUCTIONS CM340B
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 27 of 28
Side Panel Installation (CNPS)
Lift up side panel until mounting hooks are resting on the support tube assembly. Rotate panel into place with latches open and close
latches. Adjust latch grip range if necessary. To remove reverse steps. If side panels are going to be used between cabinets, install (if
needed) prior to ganging cabinets. If switch air ducting (CNAE series) will be used with side panels between ganged cabinets, install both
ducting and side panels prior to ganging.
Note:
The side panel is bonded the cabinet at the interface between the spring clips on
the top cap and the side panel masked area. If a side panel is moved to a different
cabinet, the masking should be removed from the cabinet top cap and hardware
should be moved as shown on page 26.
Mounting Hooks
Support Tube Assembly
Side Panel
Latch
Remove masking (if needed)