INSTRUCTIONS CM661A
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 7 of 12
Equipment Rail Installation
•
Move equipment rail to desired positon
•
Secure equipment rail to cabinet with[4] Torx screws and [4] hex nuts per rail
•
NOTE: Front equipment rails are integral to the cabinet frame and are in a fixed position
•
NOTE: Diamond cutouts on cabinet frame indicate mounting holes to allow for 742mm industry standard
equipment rail spacing. Mount equipment rails to mounting holes immediately in front of diamond cutouts.
[2] M6 Torx Screws
(use T30 Torx bit)
[2] Hex Nuts
(use 10mm wrench)
[2] M6 Torx Screws
(use T30 Torx bit)
[2] Hex Nuts
(use 10mm wrench)
Diamond Cutout
Diamond Cutout